Regional Cost Estimator (CPWD DSR 2026)
Commercial Quantity Surveying Division

2026 Residential Construction Cost & Material Calculator

Calibrated against real contractor bills and CPWD DSR 2023 rates in the Bilaspur (UP) & Rudrapur (UK) corridor. Prevent 15-20% contractor overbilling with certified material takeoff.

Plot Specifications

25 ft
40 ft
Regional Cost Factor: Includes RCC structure, brick masonry, plaster, vitrified tiles, electrical wiring, plumbing, and basic paint.
Estimated Construction Budget ₹43.0 — ₹49.0 Lakhs
Built-up Area 2,000 Sq.Ft
IS 1200 Major Material Requirements:
Cement
~800 Bags
OPC / PPC 50kg
Steel (Fe500D)
~6,800 kg
6.8 Metric Tonnes
Red Bricks
~42,000 Pcs
1st Class Kiln
Coarse Sand
~3,600 cft
Zone II Coarse
Send This Estimate to Er. Rahul for Official BOQ →

Itemized IS 1200 BOQ

Detailed Bill of Quantities covering all 10 construction divisions (earthwork, concrete, rebar, masonry, plaster, flooring, plumbing, electrical). Give this to contractors so they cannot introduce hidden extra charges.

Contractor Billing Audits

Running Account (RA) billing verification. Er. Rahul Saxena audits contractor measurement sheets (MB) on-site, catching fake quantities, duplicate deductions, and inflated mortar ratios before you make payments.

Turnkey Contract Governance

Legal engineering contract drafts with milestone payment schedules tied to actual slab casting and brickwork completion stages. Protect your hard-earned money from dishonest contractors.

Call Er. Rahul WhatsApp Now