12-Category zero-wastage standard room dimensions for Indian residential villas and institutional buildings. Pure solid masonry, face-to-face clear dimensions, and NBC 2016 Part 3 spatial compliance.
External walls are strictly modeled as 230 mm (9") Solid Brickwork. Internal partitions are strictly modeled as 115 mm (4.5") Solid Brickwork. Layer slicing (200mm + 15mm plaster) is permanently banned. Every dimension on floor plans represents the True Clear Face-to-Face Distance ($L imes W$) between brick walls. What the architect models = What appears on the drawing sheet = What the site mason measures with tape. Zero "+30mm" mental math.
| Classification | Dimensions (MM) | Dimensions (Feet-Inches) | Clear Area | Recommended Use / Layout |
|---|---|---|---|---|
| Compact | 3600 × 4200 | 11'-10" × 13'-9" | 15.1 m² (163 sqft) | 3-seater sofa + 2 armchairs + TV unit |
| Standard Villa (Gold) | 4200 × 4800 | 13'-9" × 15'-9" | 20.2 m² (217 sqft) | L-shaped 6-seater sofa + coffee table + credenza |
| Spacious Formal | 4200 × 5400 | 13'-9" × 17'-9" | 22.7 m² (244 sqft) | Formal baithak + center chandelier + bar unit |
| Grand Luxury Living | 4800 × 6000 | 15'-9" × 19'-8" | 28.8 m² (310 sqft) | Double-height atrium living hall overlooking Mandir |
| Living + Dining Spine | 4200 × 7200 | 13'-9" × 23'-7" | 30.2 m² (325 sqft) | Continuous open-concept family living and dining core |
| Type | Dimensions (MM) | Dimensions (Feet-Inches) | Area | Features & Clearances |
|---|---|---|---|---|
| Presidential Master | 4800 × 5400 | 15'-9" × 17'-9" | 25.9 m² (279 sqft) | King bed + lounge seating + luxury walk-in dressing |
| Executive Master (Standard) | 4200 × 4800 | 13'-9" × 15'-9" | 20.2 m² (217 sqft) | King bed (1800x2000) + 900mm perimeter + ensuite |
| Standard Bedroom | 4200 × 4200 | 13'-9" × 13'-9" | 17.6 m² (190 sqft) | Queen bed + full wardrobe wall + study desk |
| Compact Bedroom | 3600 × 4200 | 11'-10" × 13'-9" | 15.1 m² (163 sqft) | Passes Rule 96 minimum threshold without feeling tight |
| Guest Bedroom | 3600 × 3600 | 11'-10" × 11'-10" | 13.0 m² (140 sqft) | Ground floor guest bedroom or parent suite |
| Configuration | Dimensions (MM) | Dimensions (Feet-Inches) | Area | Ergonomic Standard |
|---|---|---|---|---|
| Island Luxury Kitchen | 3600 × 4200 | 11'-10" × 13'-9" | 15.1 m² (163 sqft) | Central 900x1800 breakfast island + dual counters |
| Parallel Modular (Chef Standard) | 2400 × 3600 | 7'-10" × 11'-10" | 8.6 m² (93 sqft) | 600mm counters + 1200mm clear walkway (Blum joinery) |
| Standard L-Shape | 2400 × 3000 | 7'-10" × 9'-10" | 7.2 m² (78 sqft) | Hob in SE, Sink in NE, Refrigerator in SW triangle |
| Utility / Wash Yard | 1500 × 3000 | 4'-11" × 9'-10" | 4.5 m² (48 sqft) | Washing machine + double sink + service door to setback |
| Type | Dimensions (MM) | Dimensions (Feet-Inches) | Area | Fixtures & Clearances |
|---|---|---|---|---|
| 4-Fixture Luxury Master Bath | 2400 × 3000 | 7'-10" × 9'-10" | 7.2 m² (78 sqft) | Bathtub + glass walk-in shower + dual vanity + wall WC |
| 3-Fixture Master Ensuite (Standard) | 1800 × 2400 | 5'-11" × 7'-10" | 4.3 m² (46 sqft) | Clear 900x1200 glass shower partition + vanity + WC |
| Common Family Bathroom | 1500 × 2400 | 4'-11" × 7'-10" | 3.6 m² (39 sqft) | Full linear 3-zone layout (Dry vanity -> Semi-dry WC -> Wet shower) |
| Compact Attached Bath | 1500 × 2100 | 4'-11" × 6'-11" | 3.1 m² (34 sqft) | Passes NBC minimum 2.8 m² comfortably with zero fixture clash |
| Guest Powder Room (WC only) | 1200 × 1800 | 3'-11" × 5'-11" | 2.2 m² (23 sqft) | Docked at base of stair core (Rule 110) with corner vanity |
| Type | Well Dimensions (MM) | Clear Flight Width | Riser × Tread | Engineering Rule |
|---|---|---|---|---|
| Standard Dog-Leg (3.35m floor) | 2400 × 3300 | 1100 mm clear | 18 risers × 186mm • 250mm tread | Inside central/south structural spine with zero stair jog |
| Grand Duplex Stair (3.95m floor) | 2400 × 3600 | 1200 mm clear | 21 risers × 188mm • 275mm tread | Italian Statuario marble treads with 1050mm glass balustrade |
| External Service Stair | 2100 × 3000 | 950 mm clear | 18 risers × 186mm • 250mm tread | RCC cantilevered stair in side setback for tenant/roof access |
Er. Rahul Saxena solves your room circulation, 9-zone Vastu, and structural grid in Autodesk Revit 2026 within 24 hours.