Forensic Contractor Bill Auditor
IS 1200 Opening Deduction Calculator
Verify whether your contractor is illegally charging you for window, door, and beam openings. Built per IS 1200 Part 3 (Brickwork) & Part 12 (Plastering).
Single Opening Area
1.80 m²
19.38 sq.ft
IS 1200 Deduction Verdict
Deduct 1 Face Only
Clause 4.3 (0.5 to 3.0 m²)
Total Billable Deduction
7.20 m²
77.5 sq.ft