IS 456:2000 & IS 2502 Engine
Interactive Bar Bending Schedule (BBS) Calculator
Compute cutting lengths, bend deductions, lap lengths, and total tonnage in seconds. Eliminates steel scrap wastage on site.
IS 456: Slab 20mm, Beam 25mm, Col 40mm, Footing 50mm
Unit Steel Weight (D²/162)
0.889 kg/m
IS 1786 formula
Lap Length (IS 456)
564 mm
47d for M25 Fe500
Cutting Length (per Bar)
4.45 m
After bend deductions
Total Steel Weight
23.7 kg
0.024 Tons
IS Code Bend Deduction Applied:
Per IS 2502 Clause 6.1: Deduct 2d for each 90° bend and 3d for each 135° hook to account for elongation of deformed Fe 550D rebar. Zero scrap accumulation.